Avaliação de risco no transporte urbano: uma aplicação ao metrô do Rio de Janeiro
Main Article Content
Abstract
This article presents a decision analysis for the evaluation of risks in the public concession process for the Rio de Janeiro subway Line 3 project. The methodology that was used in the study produced the monetary value of the forecasted consequences from the identified risks. The risk value was added to the financial and economic values of the project and by this the new, aggregated monetary value of the project was determined. From the analysis it was understood that the project has a high level of risk, although it was shown to be financially and economically compatible with the expected return. This monetary valuation of risks contributes to significantly reducing the final value of the project, making it unattractive to potential investors.
Downloads
Download data is not yet available.
Download data is not yet available.
Article Details
How to Cite
Campos, L. C. de S., & Gomes, L. F. A. M. (1). Avaliação de risco no transporte urbano: uma aplicação ao metrô do Rio de Janeiro. Journal of Contemporary Administration, 9(1), 103-124. https://doi.org/10.1590/S1415-65552005000100006
Section
Articles
Since mid-February of 2023, the authors retain the copyright relating to their article and grant the journal RAC, from ANPAD, the right of first publication, with the work simultaneously licensed under the Creative Commons Attribution 4.0 International license (CC BY 4.0), as stated in the article’s PDF document. This license provides that the article published can be shared (allows you to copy and redistribute the material in any medium or format) and adapted (allows you to remix, transform, and create from the material for any purpose, even commercial) by anyone.
After article acceptance, the authors must sign a Term of Authorization for Publication, which is sent to the authors by e-mail for electronic signature before publication.